Quayside Storage Domes
Shiploaders are a common sight along the jetties and piers of the world. Yet these enormous machines would have no loads if it were not for the ancillary port infrastructure. Marine transport of solid bulk materials such as iron ore, coal, fertilizers, grains and wood chips is made possible through the use of port stockpiles. As bulk material gets loaded and unloaded from the ship, it is unloaded and loaded from the stockpile. Geometrica is pleased to play a part in the overall picture as an international supplier of long span storage domes that help insure such port stockpiles are environment-friendly.
Coal Handling in Bontang
The city of Bontang is no stranger to ship loading and unloading. Located in the province of East Kalimantan on the Island of Borneo, this ocean estuary is the headquarters of Indonesia’s largest fertilizer producer, PT Pupuk Kalimantan Timur (Pupuk Kaltim). Pupuk Kaltim supplies subsidized or non-subsidized sectors with urea, ammonia, NPK and organic fertilizer. The facility owns and operates its own port and special harbor, and provides an excellent example of ship loading and related technologies, such as bulk storage.
With the natural-gas market fluctuating and the government encouraging the use of coal, Pupuk Kaltim launched a project to diversify its fuel usage. It added a coal boiler in 2009. The fuel storage dome for this boiler was designed and prefabricated by Geometrica. The 80m dome covers 40,000 tons of coal, plus a coal stacker and a portal reclaimer
Geometrica had already met a high bar of achievement when previously designing the JEA Northside power plant dome in Jacksonville, FL. This award-winning facility boasts a pristine interior and exterior, and the similarities between JEA and Pupuk Kaltrim's vision were remarkable. Geometrica was selected to supply Pupuk Kaltim's long span application based on an ability to meet very specific environmental and logistical needs. Corrosive salt and the inland marine eco-system were one thing... but the 10m high reinforced-concrete perimeter ring wall covering 40,000 tons of coal was quite another, not to mention a coal stacker and a portal reclaimer. Fortunately, Geometrica has provided design, procurement and construction services for marine related bulk handling processes worldwide, including quayside storage.
Similar to the JEA Northside CFB Repowering Project
Like JEA, Pupuk Kaltim chose to use only clean-coal technologies, a circulating fluidized-bed boiler, a coal-storage dome and a continuous barge unloader. “This project was very similar to domed bulk-storage facilities we have built worldwide,” says Jorge Parada, Geometrica's site consultant. “Our galvanized-steel dome technology has proved itself in many environments and applications. Pupuk Kaltim's application along the coast of Indonesia in a tropical rainforest, is a great example.”
The coal boiler produces the steam required to help Pupuk Kaltim deliver over three million tons of urea to the area. The dome had to resist specified environmental loads, withstand corrosive attack from the humid Kalimantan environment and help control explosion hazards, and also use technology that permitted fast construction by local crews without specialized equipment. The dome structure is made of galvanized steel, and the cladding is corrosion-resistant aluminum. "Experienced Geometrica technical-support staff came to Bontang to train our local laborers and supervise their work," said Ahmad Mardiani, Pupuk Kaltim construction manager. "Because of their contributions and cooperation, our local laborers were successful and proceeded without delays."
Urea Storage in Veracruz
Grupo CICE called Geometrica about their need to store Urea as it arrived at the port of Veracruz. Urea is an extremely corrosive material. When exposed to humidity, it attacks both aluminum and galvanized steel. Further, the coast of the Gulf of Mexico is one of the most corrosive atmospheres anywhere on earth, as industrial and marine exposures combine to torture metal. CICE is a diversified logistics and transportation company. They needed to store up to 15,000t of urea while waiting for transport, and needed a building that would withstand the corrosive attacks from inside and outside the building.
Geometrica's solution for this challenging problem was a unique building of 52m internal clearance width, 18m clear height at the center, and 120m length. The building's lightweight skeleton is made of high-strength aluminum alloy and left exposed. But since urea can attack aluminum, the structure was protected by applying FRP cladding to its underside. The combination is perfect, with each material exposed only to conditions they resist: the aluminum structure is resistant to the corrosive atmosphere, and the polymer cladding resists urea attack, and prevents it from attacking the structure.
Construction took place quickly. Half-arches were assembled on the ground and lifted onto place with two light cranes. The whole construction process took 4 months. CICE's general manager on site, Cesar Zamora, said of Geometrica "Excellent quality, service, and products. 100% recommendable."
Applications for Port and Shipping Technologies
Geometrica works with plant facilities to envision the highest caliber of coordination between port and shipping technologies and the domes and plant facilities that feed them. Whether a combined shiploader/unloader is required, or a quadrant shiploader, dual linear shiploader, or a combination of both for larger vessels, Geometrica stands ready to design long span applications that complement operations portside.
How can we help your project? If you need our help, please fill the inquiry form.