Installation

 
 

With any of Geometrica's installation methods, the dome goes up quickly, safely and under budget.

 
 
Florida Center-out installation.

Florida Center-out installation.

Center-out

Constructed around a tower, the dome is assembled one ring at a time. As each progressively larger concentric ring is formed, the tower lifts the structure to accommodate its new height. The dome grows outward and upward, gradually forming the shell.

 
 

Quebrada Blanca Tower assembly timelapse

 
 
 

Herraura installation in Mexico.

Lift in Place

Using this method, sections are assembled at ground level and lifted into place with a standard construction crane. As sections are added, the dome takes shape. Cladding can be installed after the shell is assembled, or on individual sections as they’re put in place. This method works well when the dome is to cover a high structure and for longitudinal structures. Most assembly can be done at ground level, and other subcontractors can work simultaneously inside the dome.

 
 
 
6912633425_799d2208d0_o.jpg

Beltrami Dome assembly timelapse

Perimeter Self-supporting

With this technique, workers assemble a ring at a time, from the perimeter ring beam up using manlifts and cranes. Successive sections are attached until closure at the apex.